<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Does Toyota need Six Sigma?</title>
	<atom:link href="http://lssacademy.com/2007/05/23/does-toyota-need-six-sigma/feed/" rel="self" type="application/rss+xml" />
	<link>http://lssacademy.com/2007/05/23/does-toyota-need-six-sigma/</link>
	<description>Lean Manufacturing, Six Sigma, Lean Six Sigma, and Kaizen</description>
	<lastBuildDate>Wed, 01 Feb 2012 21:21:25 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.3.1</generator>
	<item>
		<title>By: Kentoki</title>
		<link>http://lssacademy.com/2007/05/23/does-toyota-need-six-sigma/comment-page-1/#comment-2556</link>
		<dc:creator>Kentoki</dc:creator>
		<pubDate>Thu, 18 Sep 2008 18:57:25 +0000</pubDate>
		<guid isPermaLink="false">http://lssacademy.com/2007/05/23/does-toyota-need-six-sigma/#comment-2556</guid>
		<description>Well if Toyota is a leader company and have never used Six Sigma and other companies less productive than them uses it, i think they don&#039;t have a truly reason to change their methods.
Six Sigma methodology probably does not match with their culture and because of that they don&#039;t use it.</description>
		<content:encoded><![CDATA[<p>Well if Toyota is a leader company and have never used Six Sigma and other companies less productive than them uses it, i think they don&#8217;t have a truly reason to change their methods.<br />
Six Sigma methodology probably does not match with their culture and because of that they don&#8217;t use it.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: rob</title>
		<link>http://lssacademy.com/2007/05/23/does-toyota-need-six-sigma/comment-page-1/#comment-448</link>
		<dc:creator>rob</dc:creator>
		<pubDate>Sun, 27 May 2007 09:35:44 +0000</pubDate>
		<guid isPermaLink="false">http://lssacademy.com/2007/05/23/does-toyota-need-six-sigma/#comment-448</guid>
		<description>Well said Ron. I must admit to that coming from a quality background I tend to look at sources of variation, in processes, systems, methods, materials, measurements, people, etc first, even before I think about &quot;waste&quot;. Perhaps I&#039;m wrong in doing this but to me eliminating waste on a chronically unstable process will potentially cause more problems then it solves. Stabilise first - perhaps I&#039;m wrong?

Rob</description>
		<content:encoded><![CDATA[<p>Well said Ron. I must admit to that coming from a quality background I tend to look at sources of variation, in processes, systems, methods, materials, measurements, people, etc first, even before I think about &#8220;waste&#8221;. Perhaps I&#8217;m wrong in doing this but to me eliminating waste on a chronically unstable process will potentially cause more problems then it solves. Stabilise first &#8211; perhaps I&#8217;m wrong?</p>
<p>Rob</p>
]]></content:encoded>
	</item>
</channel>
</rss>

